Dream House

Web Log

Days 431-460

 

The Dream is almost a reality.

 

 
   
 

Watch our progress while we build           

   

Construction

Day 460

Sept. 22, 2006

 

Painting the inside of the side door.  And Brian is working on repairing a window frame to last until the warranty replacement arrives.  Brian has also installed the final door hardware on the front door.  We have also installed the doorbell button which came out really cool.

 

 

 

Construction

Day 459

Sept. 21, 2006

 

Brian is building frames for the speaker screens in the downstairs rotunda.  Daniel is sewing the screens to mount to the frames.

 
   

Construction

Day 458

Sept. 20, 2006

 

We are working of small projects and painting the inside of the front door.

 

 

   

Construction

Days

450-457

8 Days

Sept., 2006

 

Plenty of progress happening.

Brian has completed the eight box units that will be shelves in the rotunda.  He has installed the final door hardware on the front door.  He is also unfortunately back to repairing windows that are rotting away.  The manufacturer says they will be covered under warranty, but it will still take months to get the replacement windows made and installed. He is cleaning the garage in preparation for the electrical final inspection.

 

 

   

Construction

Day 449

Sept. 14, 2006

 

Brian is almost finished with the built-in rotunda display cabinets.  While working on them, Brian uncovers Daniel's plan to hang Brian in the walls and brick him in.

 

     

 

 
  Daniel is painting and painting.  He took the front door down to paint the inside of the door.  He is painting the shelving units for the rotunda. 
   

Construction

Days

443-448

 6 Days

August, 2006

We are working hard on such damn detail work.  What a pain in the ass.

Brian is working on installing closet doors and then trimming them out.  He is also working on building the shelving niches in the rotunda. In his free time, Brian is installing curtain rods so we can begin to cover windows and block the sun so carpet can be installed.

Daniel, in the meantime, is masking, masking, masking and priming, painting, and painting.  He is also still moving the truckload of sand to the various areas that need a little fill.  In the spare time, Daniel is sewing curtains for the windows.

   

Construction

Day 442

August 18, 2006

Brian is installing the pantry doors in the kitchen while Daniel is sewing curtains for the kitchen window.
 

 

   

Construction

Day 441

August 10, 2006

 

While Brian had the front door down to fabricate the trim for it, Daniel finally RE-painted the front door a different shade of red.  We both worked on a bit more painting of the trim for the windows in the garage, too.

   
 

   

Construction

Day 440

August 8, 2006

 

The electricians return to finish everything for the inspection.  The hot tub is electrified and only needs water.  The doorbell rings.  And the lights are installed in the garage.

   

August 7, 2006

NOTE:  The day before the electricians return for trim out and to finalize everything, Brian discovers the cause of short-circuiting in the second bedroom.  Apparently, we both missed it when the drywall crew covered over an electrical outlet.  Brian cut the drywall and freed the outlet.  No more problem with shorts.

   

Construction

Day 439

August 2, 2006

Still moving sand.  Still installling trim for closets.  Still painting trim.  Still building shelves.  Still putting up baseboard.
   

Construction

Day 438

August 1, 2006

Brian continues to work on fabricating the built-in shelves for the rotundas while Daniel paints trim and shelf sections as they are completed.
   

Construction

Day 437

July 29, 2006

 

Still cutting and putting up trim on the closets throughout the house.

 

 

Construction

Day 436

July 25, 2006

 

Brian is creating and installing the trim for the entryway closets.

   
 

   

Construction

Day 435

July 22, 2006

Brian is starting to work on the rotunda display shelves because we need the top section in place for the electrician to complete the low voltage lighting system.  Each shelf unit has to be custom created and it is very time consuming.

Daniel is finishing up with the painting of interior doors and most of the trim around the doors.  I am also wondering if there will ever be pictures of the progress posted?

   

Construction

Day 434

July 21, 2006

Daniel is moving sand and cooling down by painting interior doors.  Brian is working on several different projects including prepping to install a replacement window that was delivered under a warranty issue.
   

Construction

Day 433

July 20, 2006

Daniel is shoveling and moving sand in unbearable heat.  Brian is trimming out the closet doors upstairs.  In preparation for putting down carpet, we are also installing some curtain hardware and curtains upstairs to cut down on the sun coming in and fading everything.
   

Construction

Day 432

July 19, 2006

We received another dump truck load of sand to begin filling in some low areas of the yard.  While Daniel is shoveling and barrowing, Brian is working on completing the baseboard cutting and mounting in the house.  The baseboard will still need to be puttied and sanded and painted (second coat).
   

Construction

Day 431

July 18, 2006

Still working on baseboard trim.  Still priming interior doors.
   
 