Days 191-200 | |
|
|
|
|
Watch our progress while we build |
The Orlando Sentinel has been running a great series of articles on home building in Central Florida. Here is a link to the articles and an interesting (and totally unrealistic to our project) sidebar on the timeline for construction. |
|
|
||||||||||||||||||||||
Construction Day 200 December 16 The painters continue on the exterior applying the 2nd and 3rd coats of color. |
TRIVIA: We broke ground 19 months ago. The Empire State Building was built in 16 months.
|
|||||||||||||||||||||||
We have finalized the order of some custom tiles for the tub surround. Here is a picture of two prototype tiles to give an idea how the tiles will look. |
||||||||||||||||||||||||
Construction Day 199 December 15 The Pro's are coming... the Pro's are coming! Finally, we have professionals here to paint the exterior of the house and garage. |
||||||||||||||||||||||||
Construction Day 198 December 13 |
After a great vacation, we are back to priming. | |||||||||||||||||||||||
Construction Day 197 December 02 Brian is applying the last of the exterior sealer to the stucco since the exterior painters are scheduled to start on the 11th. Inside we are still "cutting in" the drywall primer. |
||||||||||||||||||||||||
Construction Days 195 & 196 November 29 & 30 |
We are doing the "cutting in" and have completed the kitchen and the bar area. We are looking at days and days for painting. | |||||||||||||||||||||||
Construction Day 194 November 28 Today, we started putting the primer paint coat onto the interior walls. Daniel does everything from 5' and up and Brian does everything from 5' and down. |
||||||||||||||||||||||||
Construction Day 193 November 26 Brian is working on the second floor deck. Daniel is making architectural drawing for quotes on shelving, tile and solid surfacing.
|
These are Daniel's drawing: Fair Warning: these links probably won't work on your computer
|
|||||||||||||||||||||||
Construction Day 192 November 21 No hired help today, but we are priming the deck frame and vacuuming up the drywall dust inside. |
||||||||||||||||||||||||
Construction Day 191 November 12 Today's crew is applying the stucco to the lathe. |
||||||||||||||||||||||||